EE472 Syllabus,
Fall 2009
|
Dates |
Subject |
Reading |
Problems |
|
Week
1 |
Introduction; Optics Fundamentals |
1.1-1.5; 2.1-2.2 |
HW1: 2-1, 2-2, 2-3, 2-8, 2-9 |
|
Lab1: Lab Intro, Handling Fiber |
|||
|
Week
2 |
Rays |
2.3 |
|
|
Lab2: Numerical Aperture |
|||
|
Week
3 |
Single-Mode Fiber |
2.5-2.6 |
HW2: 2-11, 2-12, 2-13, 2-28 |
|
Tuesday follows Monday schedule (no lab) |
|||
|
Week
4 |
Fiber Attenuation Group Velocity Dispersion |
3.1, 3.2 |
HW3: 2-19, 2-21, 3-3, 3-4 |
| Lab3: Fiber Coupling and Attenuation | |||
|
Week
5 |
Light Emitting Diodes Semiconductor Sources |
4.1-4.3 |
HW4: 3-13,[3-16],3-26,3-28 |
|
Lab4: Simulation Introduction, Pulse Degradation in Optical Fiber (Computer Labs) |
|||
|
Week
6 |
Laser Diodes, Photodetectors |
6.1-6.3 |
HW5: 4-4c, 4-6, 4-9, 4-13 |
|
Lab5: Laser Transmitters and Optical Modulation (Computer Lab) |
|||
|
Week
7 |
Optical Modulation | HW6: 6-3, 6-6 | |
|
Lab6: Optical Modulator Characterization |
|||
|
Week
8 |
Receiver Performance |
7.2 |
|
|
Week
9 |
Receiver Preamplifiers |
7.4 |
|
|
Lab7: Receiver Sensitivity (Computer Lab) |
|||
|
Week
10 |
|||
| Measures of fidelity (CNR/BER) |
HW7: Ch. 7 homework |
||
|
Lab8: CNR/BER Measurement |
|||
|
Week
11 |
Digital and Analog Links Passive Devices |
8.1, 9.1-9.2 10.1-10.2 |
HW8: 8-2, 8-6, 8-9 |
|
Lab9: Performance in Point-to-Point Links (Computer Lab) |
|||
|
Week 12 11/11 - VD |
Passive Devices WDM |
10.1-10.2 10.2-10.4 |
HW9: 10-2, 10-7 |
|
Lab10: Passive Device Characterization |
|||
|
Week
13 |
Optical Amplifiers |
11.1-11.3 |
HW10: 11-7, 11-8 (with lp = 980nm) |
|
Lab11: Optical Amplifiers |
|||
|
Week
14 |
Optical Networks |
12.1-12.4 |
HW11: 12-1, 12-11 |
|
Week
15 |
Design Project |
||
|
Lab: Project Demonstration and Simulation |
|||
|
Week 16 |
Design Project |
||
|
Lab: Project Demonstration and Simulation |
|||