- Programmatics
- MidSTAR-1 Document List
- Systems Engineering
Management Documents
- Integrating Contractor Deliverables
- Procedures
- Assembly Procedures
- MS-AP-1: Superstructure Assembly Procedure (12-06-03)
- MS-AP-2: Battery Assembly Procedure
- MS-AP-3: Contamination Control Plan (Rev. 1) (06-22-04)
- Test Procedures
- Launch Site Procedures
- MS-LSP-1: Offload and Set-up Procedure (11-20-06)
- MS-LSP-2: Harness Verification Procedure
- MS-LSP-3: Battery Charging Procedure (11-20-06)
- MS-LSP-4: Atlas V Battery Charge Path Verification Procedure (11-20-06)
- MS-LSP-5: Preparation and Configuration for Mate Procedure (11-20-06)
- MS-LSP-6: Final Preparation, Inspection and Close-out Procedure(11-20-06)
- MS-LSP-7: Clean and Prepare for Shipment Procedure (11-20-06)
- MS-LSP-8: Motorized Separation System Installation Procedure (11-20-26)
-
Analysis Reports
- MS-AR-1: Finite Element Analysis (04-10-06)
- MS-AR-2: Lightband Fastener Analysis
- MS-AR-3: Flight Hardware Lifting Point Analysis
- Test Reports
- MS-TR-1: Lift-point Attachment Test Report (11-02-06)
- MS-TR-2: Ground/Bond Test Report (11-07-06)
- MS-TR_4: Spacecraft Environmental Test Report (11-16-06)
- MS-TR-4a: Mass Model Environmental Test Report (09-20-06)
- MS-TR-6: Battery Test Report (11-02-06)
- MS-TR-7: Inadvertent RF Transmission Inhibits Test Report (11-02-06)
- Requirements
Verification Reports
- MS-1-RV-1:
- MS-1-RV-2: Closed 03/01/2006
- MS-1-RV-3:
- MS-1-RV-4:
- MS-1-RV-5:
- MS-1-RV-6:
- MS-1-RV-7:
- MS-1-RV-8:
- MS-1-RV-9:
- MS-1-RV-10: Closed 09/20/06
- MS-1-RV-11: Closed 09/20/06
- MS-1-RV-12: Closed 09/20/06
- MS-1-RV-13:
- MS-1-RV-14:
- MS-1-RV-15:
- Preliminary Design Review
- 4/27/05 Presentation
- Spacecraft
- Launch
- ESPA Payload Planners Guide
- ESPA Secondary Payload Questionnaire
- Delta IV Spacecraft Questionnaire
- Coordinate System
- Engineering Pictures
- CAD Model
- Mass Budget
- Mass Properties
- Assembly Schedule(03/10/06)
- Fastener Analysis for Individual Boxes
- Clickbond Procedure from NASA
- Command & Data Handling
- Requirements
- Block Diagram
- Components
- Single Board Computer
- Asynchronous Serial Card
- Synchronous Serial Card
- Telemety and Control Card
- Cables
- Inventory
- Communications
- Requirements
- Link Budget
- Structural Properties
- Power Consumption
- Schedule
- Procurement
- Block Diagram
- Layout Diagram (Bitmap)
- Layout Diagram (AutoCAD)
- Fall 2003 End of Term Report
- Power
- Performance Report
- Solar Panels
- Solar Panel Diagram
- Solar Panel Photographs
- I-V curves
- Manufacturer's Test Report
- Solar Cell Diagram
- Batteries
- System
- Power Distribution
- Wiring Diagram
- Harness
- Thermal Modeling
- Illumination Curve (STK Analysis)
- Orbital Analysis
- Solar Panel Thermal Stress
- Interior Temperature
- Design Implications
- Coatings or Blankets
- Thermal RTV
- Payloads
- ICSat
- Programmatics
- Mass Calculations
- Current Inventory
- Layout1
- Layout2
- Receive Side Block Diagram
- Transmit Side Block Diagram
- Interface Circuit Schematic
- Bit Register Values
- Fall 2003 End of Term Report
- CFTP
- Programmatics
- Preliminary Design Review 03-18-03 (USNA Only)
- Intermediate Design Review 12-09-03 (USNA Only)
- Base Configuration and Coordinate System
- Interface Drawings
- Instrument Accommodations
- Pinouts
- Power Requirements
- Data Requirements
- Interface Control Document
- Mass Properties Table
- Materials Details
- MEMS
- Envelope Drawings
- Interface Drawings
- Instrument Accommodations
- Interface Control Document
- Mass Properties Table
- Materials Details
- MIDN
- Envelope Drawings
- Interface Drawings
- Instrument Accommodations
- Pinouts
- Power Requirements
- Data Requirements
- Interface Control Document
- Mass Properties Table
- Materials List
- Nano ChemSensor Unit
- Envelope Drawings
- Interface Drawings
- Instrument Accommodations
- Interface Control Document
- Mass Properties Table
- Materials Details
- Eclipse
- Instrument Accommodations
- Interface Control Document
- Mass Properties Table
- Materials Details
Structure
- MS-TP-1: Lift-point Attachment Test Plan
- MS-TP-4: Environmental Test Plan (01-19-06)
- Overall Design
- Rack Design
- Roof Design
- Hardware/Software
- Inventory of Parts
- Frequency Allocation Request
- Remaining schedule
- Mechanical
- Requirements
- Concept Models/Drawings (PowerPoint)
- Concept Models/Drawings (PDF)
- Testing
- Transportation Plan
- Electrical
- Spacecraft Integration Procedures
- Spacecraft Launch Operations Plan
';