  1. Programmatics
    1. MidSTAR-1 Document List
      1. Systems Engineering Management Documents
        1. Integrating Contractor Deliverables
          1. Ground Operations Document (07-11-05)
          2. Missile System Preflight Safety Package (07-10-06)
          3. Integrated Master Schedule (02-15-06)
      2. Procedures
        1. Assembly Procedures
          1. MS-AP-1: Superstructure Assembly Procedure (12-06-03)
          2. MS-AP-2: Battery Assembly Procedure
          3. MS-AP-3: Contamination Control Plan (Rev. 1) (06-22-04)
        2. Test Procedures
          1. MS-TP-1A: Lift-point Attachment Test Procedure (06-13-06)
          2. MS-TP-2: Ground/Bond Test Procedures
          3. MS-TP-3: Comprehensive Performance Test Procedure (11-16-06)
          4. MS-TP-4: Vibration Test Procedure
          5. MS-TP-6: Battery Test Procedure
          6. MS-TP-7: Inadvertent RF Transmission Inhibits Test Procedure
        3. Launch Site Procedures
          1. MS-LSP-1: Offload and Set-up Procedure (11-20-06)
          2. MS-LSP-2: Harness Verification Procedure
          3. MS-LSP-3: Battery Charging Procedure (11-20-06)
          4. MS-LSP-4: Atlas V Battery Charge Path Verification Procedure (11-20-06)
          5. MS-LSP-5: Preparation and Configuration for Mate Procedure (11-20-06)
          6. MS-LSP-6: Final Preparation, Inspection and Close-out Procedure(11-20-06)
          7. MS-LSP-7: Clean and Prepare for Shipment Procedure (11-20-06)
          8. MS-LSP-8: Motorized Separation System Installation Procedure (11-20-26)
      3. MS-TP-5: Transportation Plan
      4. Interface Control Documents
        1. MS-ICD-1: CFTP
        2. MS-ICD-2: NCSU
        3. MS-ICD-3: MEMS
        4. MS-ICD-4: Eclipse
        5. MS-ICD-5: MiDN
      5. Reports
        1. Analysis Reports
          1. MS-AR-1: Finite Element Analysis (04-10-06)
            1. Dynamic Modes Power Point Presentation
          2. MS-AR-2: Lightband Fastener Analysis
          3. MS-AR-3: Flight Hardware Lifting Point Analysis
        2. Test Reports
          1. MS-TR-1: Lift-point Attachment Test Report (11-02-06)
          2. MS-TR-2: Ground/Bond Test Report (11-07-06)
          3. MS-TR_4: Spacecraft Environmental Test Report (11-16-06)
          4. MS-TR-4a: Mass Model Environmental Test Report (09-20-06)
          5. MS-TR-6: Battery Test Report (11-02-06)
          6. MS-TR-7: Inadvertent RF Transmission Inhibits Test Report (11-02-06)
        3. Requirements Verification Reports
          1. MS-1-RV-1:
          2. MS-1-RV-2: Closed 03/01/2006
          3. MS-1-RV-3:
          4. MS-1-RV-4:
          5. MS-1-RV-5:
          6. MS-1-RV-6:
          7. MS-1-RV-7:
          8. MS-1-RV-8:
          9. MS-1-RV-9:
          10. MS-1-RV-10: Closed 09/20/06
          11. MS-1-RV-11: Closed 09/20/06
          12. MS-1-RV-12: Closed 09/20/06
          13. MS-1-RV-13:
          14. MS-1-RV-14:
          15. MS-1-RV-15:
    2. MidSTAR-1 Technical Requirements Document
    3. MidSTAR-1 Memorandum of Agreement
    4. Design Reviews
      1. Preliminary Design Review
        1. Presentation
        2. Action Items
      2. Critical Design Review
        1. Agenda
        2. Action Items
      3. Annual Review
        1. 4/27/05
        2. Presentation
      4. Pre-ship Review (11-15-06)
      5. IPT Slides (09/21/06)
  2. Cost
    1. Expenditures (02/08/06)
  3. Schedule
    1. Integrated Master Schedule (01/24/06)
    2. Work Breakdown Structure
      1. Structures
      2. Electrical Power
      3. Main Communications
      4. Command and Data Handling
      5. ICSat Experiment
      6. Ground Station
      7. Operations
  4. Performance
    1. Spacecraft
      1. Launch
      2. ESPA Payload Planners Guide
      3. ESPA Secondary Payload Questionnaire
      4. Delta IV Spacecraft Questionnaire

      Structure

      1. Coordinate System
      2. Engineering Pictures
        1. Exterior View
        2. Mechanical Drawings
          1. .PDF
            1. ESPA attachment surface
            2. Inner shelf
            3. Middle shelf
            4. Outer shelf
            5. Outer deck
            6. Stringer
            7. Close-out panel
            8. Lifting point attachment (boss)
          2. 3D Illustrations
            1. SolidView
              1. .SFX
                1. MidSTAR-1
                2. ESPA attachment surface
                3. Inner Shelf
                4. Middle Shelf
                5. Outer Shelf
                6. Outer Deck
                7. Stringer
                8. Close-out Panel
                9. Solar Panel
              2. .EXE
                1. ESPA attachment surface
                2. MidSTAR-1
                3. Outer Deck
                4. Outer Shelf
                5. Middle Shelf
                6. Inner Shelf
                7. Stringer
                8. Close-out Panel
                9. Solar Pane
              3. eDrawings                
                1.  MidSTAR-1
          3. Assembly Drawings
      3. CAD Model
        1. STEP File (03/28/05)
        2. Zip File (03/28/05)
        3. PKG Files
      4. Mass Budget
        1. Master Parts List  (08/29/06)
        2. Bill of Materials (10/20/05)
        3. Preliminary Fastener List
        4. Cable List
        5. Connector List
        6. Numbering Scheme
      5. Mass Properties
        1.  (English) (04/04)
        2.  (Metric)(04/04)
      6. Assembly Schedule(03/10/06)
      7. Fastener Analysis for Individual Boxes
      8. Clickbond Procedure from NASA
    2. Command & Data Handling
      1. Requirements
      2. Block Diagram
      3. Components
        1. Single Board Computer
        2. Asynchronous Serial Card
        3. Synchronous Serial Card
        4. Telemety and Control Card
        5. Cables
        6. Inventory
    3. Communications
      1. Requirements
      2. Link Budget
      3. Structural Properties
      4. Power Consumption
      5. Schedule
      6. Procurement
      7. Block Diagram
        1. Transmitter
        2. Receiver
        3. Modem
        4. Combiners/Dividers
        5. Antennas
      8. Layout Diagram (Bitmap)
      9. Layout Diagram (AutoCAD)
      10. Fall 2003 End of Term Report
    4. Power
      1. Performance Report
        1. Power Available
        2. Power Demand
        3. Power Operations
      2. Solar Panels
        1. Solar Panel Diagram
        2. Solar Panel Photographs
          1. Close-up View
          2. Installed on Close-out Panel
        3. I-V curves
        4. Manufacturer's Test Report
        5. Solar Cell Diagram
      3. Batteries
        1. KR-4400 D Cell
        2. Cell MSDS Sheet
        3. Battery Layout
      4. System
        1. Power Distribution
        2. Wiring Diagram 
          1. Diagram 1
          2. Diagram 2
        3. Harness
          1. Pinouts
    5. Thermal Modeling
      1. Illumination Curve (STK Analysis)
      2. Orbital Analysis
      3. Solar Panel Thermal Stress
      4. Interior Temperature
      5. Design Implications
        1. Coatings or Blankets
        2. Thermal RTV
    6. Payloads
      1. ICSat
        1. Programmatics
          1. Experiment Requirements Document
          2. Abbreviated Memorandum
        2. Mass Calculations
        3. Current Inventory
        4. Layout1
        5. Layout2
        6. Receive Side Block Diagram
        7. Transmit Side Block Diagram
        8. Interface Circuit Schematic
        9. Bit Register Values
        10. Fall 2003 End of Term Report
      2. CFTP
        1. Programmatics
          1. Preliminary Design Review 03-18-03 (USNA Only)
          2. Intermediate Design Review 12-09-03 (USNA Only)
        2. Base Configuration and Coordinate System
        3. Interface Drawings
        4. Instrument Accommodations
          1. Pinouts
          2. Power Requirements
          3. Data Requirements
        5. Interface Control Document
        6. Mass Properties Table
        7. Materials Details
      3. MEMS
        1. Envelope Drawings
        2. Interface Drawings
        3. Instrument Accommodations
          1. Pinouts
          2. Power Requirements
          3. Data Requirements
        4. Interface Control Document
        5. Mass Properties Table
        6. Materials Details
      4. MIDN
        1. Envelope Drawings
        2. Interface Drawings
          1. Outer Sensor
          2. Electronics Box
          3. Insulated Sensor Box
        3. Instrument Accommodations
          1. Pinouts
          2. Power Requirements
          3. Data Requirements
        4. Interface Control Document
        5. Mass Properties Table
        6. Materials List
      5. Nano ChemSensor Unit
        1. Envelope Drawings
        2. Interface Drawings
        3. Instrument Accommodations
          1. Pinouts
          2. Power Requirements
          3. Data Requirements
        4. Interface Control Document
        5. Mass Properties Table
        6. Materials Details
      6. Eclipse
        1. Envelope Drawings
        2. Interface Drawings
        3. Instrument Accommodations
          1. Pinouts
          2. Power Requirements
          3. Data Requirements
        4. Interface Control Document
        5. Mass Properties Table
        6. Materials Details
    7. Test Plans
      1. MS-TP-1: Lift-point Attachment Test Plan
      2. MS-TP-4: Environmental Test Plan (01-19-06)
    8. Ground Station
      1. Overall Design
        1. Requirements
          1. Slew rates
          2. Link budget
        2. Specifications
          1. Table of how equipment meets requirements
        3. Block Diagram
      2. Rack Design
        1. Rack equipment diagram
        2. Rack connection diagram
        3. Rack cabling list
      3. Roof Design
        1. Box at antenna connections
        2. Feed point enclosure
        3. Roof cabling list
        4. Cable Run
      4. Hardware/Software
      5. Inventory of Parts
      6. Frequency Allocation Request
      7. Remaining schedule
    9. Ground Support Equipment
      1. Mechanical
      2.  
        1. Requirements
        2. Concept Models/Drawings (PowerPoint)
        3. Concept Models/Drawings (PDF)
        4. Testing
        5. Transportation Plan
      3. Electrical
        1. RF Ground Support Equipment Block Diagram
    10. Operations
      1. Spacecraft Integration Procedures
      2. Spacecraft Launch Operations Plan
  5. References
    1. Cleanliness Levels and Contamination Control Requirements
    2. Test Requirements for Launch, Upper-Stage and Space Vehicles
    3. Design, Construction and Testing Requirements for One of a Kind Space Equipment
    4. General Specifications for Moving Mechanical Assemblies for Space and Launch Vehicles