Levied Requirements
- The communications components have dimensions that require a housing box of certain dimensions to be made by the structures team. The structures team must also provide a bus that is capable of supporting the mass of the communications, as determined in the mass budget.
- The EPS team must be able to provide enough power for the communications components to operate. These power requirements can be found in the Power Requirements document linked here: Power Requirements
';