';

Levied Requirements

  1. The communications components have dimensions that require a housing box of certain dimensions to be made by the structures team. The structures team must also provide a bus that is capable of supporting the mass of the communications, as determined in the  mass budget.
  2. The EPS team must be able to provide enough power for the communications components to operate. These power requirements can be found in the Power Requirements document linked here: Power Requirements