ICSat Testing Status
ICSat testing began in the Summer of 2004 and will continue through the Fall of 2005. The following tests have been completed:
- Closed Communications Link Test
- Test Status -- COMPLETE JUL04
- All of the ComBlock circuit boards successfully passed data from the receiver and back out through the transmitter. The Command and Data Handling System was not included in this test.
- Test Setup and Results
- Test Status -- IN PROGRESS NOV04
- Test Setup and Results
';