Skip to main content Skip to footer site map
Electrical and Computer Engineering Department

EE320: Introduction to Electrical Engineering II

Week Date Lesson Lab Number Topic Read Homework
1 21-Aug 1   Course Introduction, Launchers, DC-DC Converters Intro - EM Launcher Project
22-Aug LAB 1 AC Signals Intro, Oscilloscope review, Wind Inductor  
23-Aug 2   Buck Chopper: Duty Cycle and Inductance Design -

 HW1: Buck Chopper Design

Solution

2 28-Aug 3   RMS Values -  
29-Aug LAB 2 Buck Chopper Design 1: Gate Drive/Oscillator  
30-Aug 4   Buck Chopper: MOSFET as switch -

 HW2: Ch 9: 11,35,40,42,56 + Launcher Deliverables Due Sept 6.

Solution

3 4-Sep -   NO CLASS (Labor day)    
5-Sep 5 Buck Chopper: Capacitance Design -  
6-Sep 6   EM Launch Concept discussion/presentations -

 HW3: Due Sept 13

CH10: 7,19,25,30

CH11:22,24,26

Solution

4 11-Sep 7   AC Analysis Review (Phasors, Impedance):  CDR, VDR, Thevenin, Nodal Analysis 9.1-9.7  
12-Sep LAB 3 Buck Chopper Design: Main Circuit Finish/testing  
13-Sep 8   Single Phase Power: Instantaneous and Average Power 11.1-11.2  HW4: Due Wed Sept. 20

1. From Book, Ch 11:  1,3,7,13,16,21
2. Read up on EM launch stuff you learned in class and think about picking the type of system you will design for the detailed study. Pick a primary and an alternate, and write it at the top of your HW. You can change later, but you should have an idea now.

Solution

5 18-Sep 9   Single-Phase Power: Max Power Transfer 11.3-11.4  
19-Sep LAB 4 Experiment # 2: Single Phase Power  
20-Sep 10   Single Phase Power: Complex, Reactive, and Apparent Power, Power Factor  11.5-11.7

 Homework: CH11: 39,52,56,69,74

DUE MONDAY 9/25 (to allow time to review)

Solutions: 5th ed text,   6th ed text

6 25-Sep 11   Exam / Homework Review -  
26-Sep LAB 5

Finish Buck Choppers

Home Wiring

Control Panel Components Lab Start

 
27-Sep 12   Exam 1 -  
7 2-Oct 13 EM Launch Downselect/ Detailed Analysis Presentations -  
3-Oct LAB 6 Control Panel Components  
4-Oct 14 Power Factor Correction 11.8-11.9

 Homework: Chapter 12: 2,4,7,8,10

Have launcher presentations ready.

Due Wed 10/11

Solutions

8 9-Oct -   NO CLASS (Columbus day) #N/A  
10-Oct LAB 7 Experiment #3: Power Factor Correction  
11-Oct 15   Three-Phase Systems – Sources, Loads, negative/positive sequence, Line and phase quantities 12.1-12.3

 Homework: Chapter 12: 14,21,22,25,27

Due Wed 10/18

Solutions

9 16-Oct 16   Y-Y Analysis 12.3  
17-Oct LAB 8 Field Trip (tentative)  
18-Oct 17   Three Phase Power: ∆-∆, Y-∆, ∆-Y Analysis 12.4-12.6

 Homework:

1. Chapter 12: 33,36,40,47,49,51

2. FINAL parts list for launchers (with vendor, part number, qty, price), one per group, via email. Must be reviewed with faculty before submitting.

Due Wed 10/25

Solutions

10 23-Oct 18 Three Phase Power: Power Calculations, Unbalanced Systems 12.7-12.8  
24-Oct LAB 9 Experiment #4: Three Phase Power Y-Y  
25-Oct 19 Three Phase Power Continued -  
11 30-Oct 20   Exam / Homework Review -  
31-Oct LAB 10 EM Launch Prelim Test  
1-Nov 21   Exam 2 -  
12 6-Nov 22 Mutual Inductance, Magnetic Energy, Linear Transformers 13.1-13.4  
7-Nov LAB 11 Experiment # 5: Three Phase Power Y-D  
8-Nov 23 Single Phase Transformers, Equivalent Circuits, Ideal Transformers 13.5

 HW: 13: 6,8,12,36,39,42

Due Wed 11/15

Solutions 6th ed

Solutions 5th ed

13 13-Nov 24   Impedance Matching, Guided Inductor Design -  
14-Nov LAB 12 Launch Testing  
15-Nov 25   Three Phase Transformers: Y-Y/D-D,Y-D/D-Y 13.7

 HW: Inductor

Due Wed 11/22.

We will go over in class Monday 11/19

Solutions

14 20-Nov 26   Breakers, Protection, and Power Flow 0  
21-Nov LAB 13 Experiment #6: Transformers  
22-Nov 27   Synchronous Machines: Description, Rotating flux, Synchronous Speed, Per Phase Equivalent Circuit -  
15 27-Nov 28   Synchronous Machines: Per Phase equivalent Circuit continued -

 Short HW: 13: 53,73,74,75

Due Wed 11/29

Solutions 6th ed

Solutions 5th ed

28-Nov LAB 14 Synchronous Machines: Power flow diagram, Torque equation, Parameter Estimation  
29-Nov 29   Experiment #6: Transformers -

 Final HW: Generators. Due Wed 12/6

Please try it for mon/tues.

Solution

16 4-Dec 30   Catchup/Final Review -  
5-Dec LAB 15 Lab Practicum  
6-Dec 31   Launch Details/Final Review -  
go to Top